Home
Online Services
Company
Commercial
Operations
HS&E
Enhancement
Media Centre
Interconnector UK Ltd
Interconnector Bacton Terminal
Zeebrugge terminal enhancement
In this section



 

 

 

 

 

 

 

 

IMAGES



Electric motor assembly



Compressor casing

The first compressor and electric motor installed in new compressor building August 2004

 

One of the two new 150kV transformers required to supply the 35MW electric motors

 

The new aftercoolers installed in Zeebrugge

 



Inside Bacton boiler house (April 2005)



Pipework tie-in at Zeebrugge during maintenance period (July 2005)


INTERCONNECTOR ACCESS
 How to become a Shipper

TOOLS
 Units converter
 Site map

 RSS feeds |

LINKS
 Related sites
 Shippers


Copyright Interconnector (UK) Limited 2003 Inte r c o n n e c t or || | Legal Notice | | |FAQs | | Contact Us  
Quick Links | Contact Us | FAQs | Site Map | Site Search |