Home
Online Services
Company
Commercial
Operations
HS&E
Enhancement
Media Centre
Interconnector UK Ltd
Interconnector Bacton Terminal
Zeebrugge terminal enhancement
In this section



 

 

 

 

 

 

 

 

IMAGES



Electric motor assembly



Compressor casing

The first compressor and electric motor installed in new compressor building August 2004

 

One of the two new 150kV transformers required to supply the 35MW electric motors

 

The new aftercoolers installed in IZT

 



Inside IBT boiler house (April 2005)



Pipework tie-in at IZT during maintenance period (July 2005)


INTERCONNECTOR ACCESS

How to become an
Interconnector Shipper

OPERATIONAL DATA
 Online services
 Daily summary
 Capacity summary
 Historical flows
 Information provision
TOOLS
 Site map
 Units converter
RSS FEEDS
RSS feeds
DOWNLOADS
 Daily summary
 Historical flows

Legal notice

LINKS
 Related sites

Shippers

 


Copyright Interconnector (UK) Limited 2011 Inte r c o n n e c t or || | Legal Notice | | |FAQs | | Contact Us  
Quick Links | Contact Us | FAQs | Site Map | Site Search |