












|
|
Interconnector (UK) Limited operates a sub sea gas
pipeline and terminal facilities to provide a strategic bi-directional
link between the UK and Continental European energy markets.
The Interconnector system comprises compression terminals at Bacton
in UK and Zeebrugge in Belgium connected by a 235 kilometre pipeline.
It is currently capable of transporting 25.5 billion cubic metres of
gas per annum from Zeebrugge to Bacton and 20.0 bcm per annum in the
opposite direction.
Interconnector Shippers are able to reach the gas markets of continental
Europe and the UK by transporting and/or trading between the two hubs
linked by the Interconnector pipeline.
The net amount of gas flowing each day is dependent on the quantities
nominated by individual shippers. Shippers nominate their requirements
to Interconnector who manage the process of validation and aggregation
which determines the daily quantity of energy to be transported into
and out of the system.
The
company Environment
& community Enhancement
project


25 March 2008: Interconnector (UK) Limited today confirmed that the
UK-Belgium gas interconnector will be shut down for planned annual maintenance
for a period of 15 days commencing 06:00 hours Wednesday 27 August 2008
and ending 06:00 hours Thursday 11 September 2008.
^^back
to top
|
TOOLS
Units
converter
Site
map
Add
to favourites
LINKS
Related
sites
Shippers
|
|
|